Chan, A P C, Wong, F K W, Chan, D W M, Yam, M C H, Kwok, A W K, Lam, E W M and Cheung, E (2008) Work at Height Fatalities in the Repair, Maintenance, Alteration, and Addition Works. Journal of Construction Engineering and Management, 134(07), 527–35.

Damnjanovic, I and Zhang, Z (2008) Risk-Based Model for Valuation of Performance-Specified Pavement Maintenance Contracts. Journal of Construction Engineering and Management, 134(07), 492–500.

Eastman, C M and Sacks, R (2008) Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities. Journal of Construction Engineering and Management, 134(07), 517–26.

Goedert, J D and Meadati, P (2008) Integrating Construction Process Documentation into Building Information Modeling. Journal of Construction Engineering and Management, 134(07), 509–16.

  • Type: Journal Article
  • Keywords: Data communication; Information retrieval; Information management; Parameters; Three-dimensional models; Construction management; Documentation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:7(509)
  • Abstract:
    The research described in this paper extends the use of building information modeling (BIM) throughout the construction phase of the project life cycle. The owner is a military base that uses three-dimensional (3D) modeling for underground services and the footprints of the buildings. They were interested in determining the feasibility of capturing the construction process and related documents into a similar format. The research was conducted in parallel with traditional methods. The objectives of this project were to create a 3D as-built model, a four-dimensional as-built model, and attach the construction process information to the model for the owner to use after construction. A literature review indicates that BIM application stops at the preconstruction phase with a limited amount of research regarding data collection of the construction process. Significant contributions include practical 3D data collection methods and extending the BIM software products to accommodate construction process documentation. Results indicate that BIM software is not specifically prepared to accomplish these objectives and some modification to procedures as well as software were necessary for the BIM to capture the construction process documentation.

Hyun, C, Cho, K, Koo, K, Hong, T and Moon, H (2008) Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. Journal of Construction Engineering and Management, 134(07), 468–82.

Nguyen, L D and Ibbs, W (2008) FLORA: New Forensic Schedule Analysis Technique. Journal of Construction Engineering and Management, 134(07), 483–91.

Salem, O and Mohanty, S (2008) Project Management Practices and Information Technology Research. Journal of Construction Engineering and Management, 134(07), 501–8.

Sanad, H M, Ammar, M A and Ibrahim, M E (2008) Optimal Construction Site Layout Considering Safety and Environmental Aspects. Journal of Construction Engineering and Management, 134(07), 536–44.

Tam, V W Y, Le, K N and Le, H N (2008) Using Gaussian and Hyperbolic Distributions for Quality Improvement in Construction: Case Study Approach. Journal of Construction Engineering and Management, 134(07), 555–61.

Tang, W, Qiang, M, Duffield, C F, Young, D M and Lu, Y (2008) Incentives in the Chinese Construction Industry. Journal of Construction Engineering and Management, 134(07), 457–67.

Zhang, H, Li, H and Lu, M (2008) Modeling Time-Constraints in Construction Operations through Simulation. Journal of Construction Engineering and Management, 134(07), 545–54.